From:                              route@monster.com

Sent:                               Tuesday, June 14, 2016 5:14 PM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: IMS Integration

 

This resume has been forwarded to you at the request of Monster User xapeix03

Victor Salinas 

Last updated:  06/01/16

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Rowland Heights, CA  91748
US

Mobile: 7184061884   
vsalinash@gmail.com
Contact Preference:  Telephone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Victor Salinas

Resume Value: 4sjueurrv7eh2gq5   

  

 

Curriculum vitae

 

PERSONAL DETAILS

 

NameVictor Salinas Hernandez

Cell Phone(626) 474 5439

AddressRowland Heights, CA

Emailvs.hernandez@hotmail.com

vsalinash@gmail.com

Skypesalinasv45

 

EDUCATION

 

The University of Phoenix.Phoenix, Arizona

Master of Business AdministrationOn Hold

 

Instituto Politécnico Nacional-Mexico City, México

Bachelor of ScienceCompleted

Major; Engineering in Electronics and Communications

 

Instituto Tecnológico de Estudios Superiores de Monterrey.Monterrey, México

Diplomas

Major in LogisticsCompleted

Major in ManagementCompleted

 

PROFESSIONAL EXPERIENCE

 

NokiaMexico City, Mexico

GSS NI/TI Service Solution Specialist09/2014 – actual

 

·               Supporting Network Implementation / Telecom Implementation (NI/TI) services solutions for major carriers in Latin America and North America. Installation and Integration services of Nokia proprietary equipment and 3rd party equipment (HP and Juniper mainly) for RAN (GSM, WCDMA, LTE, VoLTE, Power, Antennas, Backhaul, and small cells), including Core Network (AAA, IMS, NecAct, etc.) and some Virtualization Networks solutions.

·               Calculation and technical description of physical installation, cabling, and materials needed for implementation, men work effort for site survey, site planning, commissioning and integration.

 

Instituto Politecnico NacionalMexico City, Mexico

RF and Transmission project01/2014 – 07/2014

 

·               Phase 1: RF design engineering proposing some cell sites to offer coverage to some rural community in Mexico, using propagation models to determinate coverage, site capacity and site location, join together with site survey and equipment and antennas proposals.

·               Phase 2: Transmission design using path loss as propagation model in order to link all these sites and be connected to the BSC, determination of the operation frequency, link capacity, site survey, path survey, antenna highs, dish diameter, equipment proposal and traffic capacity.

 

 

 

Grupo Radiofrecuencia y Propagación S. de R.L.Monterrey, México

Contrator04/2013 – 06/2013

 

·               Responsible for validating Huawei equipment installation as main duties performed as well as coordinating the installation of BBU power supply system and Microwaves links.

·               Site survey to get all ATP formats and clean up processes to deliver installation to the final customer.

 

Lemcon USA Corp.New Jersey, USA

Node B Engineer10/2010 – 02/2013

 

·               AT&T Carrier Aggregation Project (New York, New Jersey); Commissioning and integration of 2G Ultrasite equipment, new site build installation including, 2G Nokia BTS, Argus dc power supply with battery cabinets and 3G Lucent nodeB, site support to troubleshoot BTS alarms and upgrading and downgrading BTS TRX capacity, Site preparation, site survey, and site drawing, and get all documents needed for ATP and deliver to the customer.

·               T-Mobile Modernization Project (Dallas); Covering all aspect in the cell site, installation, commissioning and integration, swapping Nortel 2G equipment, implementing NSN Flexi (2G/3G) equipment, dc power supply and fiber optic ground system, call testing and cell neighbor validation, collecting snapshot for report and fulfill data documentation to validate service. Site preparation, site survey and site drawing and get all documents needed for ATP and deliver to the customer.

·               T-Mobile Modernization Project (Houston); Holder of Nokia certification in order to do Node B installation, commissioning and integration with a valid PTU, for Flexi 2G/3G multiradio, mentor for less experienced general labor crew for site ground, Power supply system, antenna and COVP installation process till commissioning and integration of the site including call testing analysis and local drive test to validate service after integration and alarm validation, collecting and reporting snapshot and data documentation to validate service. Site preparation, site survey and site drawing and get all documents needed for ATP and deliver to the customer.

·               AT&T Project (New York, New Jersey); Working as site integrator and Field Support Engineer, Installing and integrating Nokia’s Ultrasite 2G equipment including installation of BBU power supply system (ARGUS) and LUCENT 3G cabinets and DAS systems, as well as upgrade, downgrade and cell site troubleshooting, mentoring less skilled technicians, including call testing and drive test Site preparation, site survey, and site drawing, and get all documents needed for ATP and deliver to the customer.

·               AT&T Project (Michigan/Indiana); Installation and Integration of Nokia’s 2G Ultrasite equipment, more than 100 sites installed and integrated to get the goal of the project, clean-up alarm site activities after project implementation, resolving configuration and operational issues as well as upgrade and downgrade of the site configuration and call testing and drive test. Site preparation and get all documents needed for ATP and deliver to the customer.

·               T-Mobile project (Phoenix); Working as Node B site service engineer, identifying issues and troubleshoot the Nokia’s Flexi Node B operation, decommissioning and commissioning sites cleaning up all alarms, doing a test with PDU’s and MHA’s reconfiguring parameters and/or resolving problems including call testing analysis.

 

 

 

 

 

Human World (NSN Service Delivery)Mexico City, Mexico

FLM Manager Consultant01/2010 – 08/2010

 

·               This project was developed in two different phases.

·                                               Phase 1; identifying and defining human resources and job activities, as well as organizational department, activities responsibilities and interdependencies (Engineering and Operation) identifying operational schedule of engineering, construction and operation departments, translating all this Nextel’s organizational structure into the new NSN Service Delivery organization granted engineering operation and field service operation preserving the budgeting and actual carrier operation. That implied re-dimensioning and re-sizing the original organizational carrier structure (human resource, tools, assets, budget, etc.) all daily activities, identifying assets, KPI’s and complementary activities to support and ensure customer service without service interruption.

·                                               Phase 2; responsible to identify, avoid and resolve issues during phase 1 implementation via mentoring and training the management team about the new organizational structure, process and implementation between Nextel and NSN, be part of the team of implementation of KPI’s and capital and operation budget, reporting running projects (CAPEX and OPEX), its schedule and implementation, reporting weekly progress to NSN and Nextel vice-presidencies.

 

Grupo Radiofrecuencia y Propagación S. de R.L.Monterrey, Mexico

Node B Engineer01/2009 – 12/2009

 

·               SDH and PDH NEC’s PASOLINK NEO microwave installation and integration

·               CISCO 2800 integration.

·               Nokia UMTS; install and commission of FLEXI node B , including dual antenna installation, RF lines and sweep test, BBU outdoor system (CD power plant), fiber optics and all the hardware ancillary co-existing wit GSM equipment, E1 test

·               Nokia GSM; installed and commissioned indoor/outdoor project execution for co-existent 800/1900 BTS UTRASITE, including ELTEK CD power system, battery backup, RF lines and sweep test, Antennas and all hardware ancillaries and electrical connection, DSX and RRI installation and E1 test

 

ADEX Telecom LLC Panama, Panama

Field Supervisor11/2008 – 12/2008

 

·               Direct contractor supervision for Ericsson Minilink Traffic Node installation and alignment

·               RBS 2206 commissioning and integration, providing contractor mentoring, operation and installation guidance

·               Troubleshooting and alarm attendance and on-call response.

 

Grupo Radiofrecuencia y Propagación S. de R.L.Monterrey, México

Node B Engineer01/2008 – 11/2008

 

·               Nokia UMTS; install and commission of FLEXI node B , including dual antenna installation, RF lines and sweep test, BBU outdoor system (CD power plant), fiber optics and all the hardware ancillary co-existing wit GSM equipment, E1 test

·               Site Audit and site distribution recommendation (Civil, Electrical, Tower, a line of sight) and CAD report.

·               Nokia GSM; installed and commissioned indoor/outdoor project execution for co-existent 800/1900 BTS UTRASITE, including ELTEK CD power system, battery backup, RF lines and sweep test, Antennas and all hardware ancillaries and electrical connection, DSX and RRI installation and E1 test

·               Drive test procedure to verify equipment operation after installation and parameters certification.

·               Ericsson ADM installation, commissioning and provisioning with customer delivery (acceptance test protocol) in Tijuana and Guadalajara

·               Siemens Microwave Installation, including ELTEK CD power plant, connections and integration, and E1 test

·               Ericsson GSM 2106 and 2206 sites attendance, line and antenna change, recovery system failure and test on preinstalled sites, including CD power plant, battery bank and microwave test and supervision

·               Ericsson UMTS 3106 trouble ticket attendance sweep test, antenna and RF line repair and sweep test

·               Civil site attendance, electrical cable recovery, RF lines and microwave BB cable repair

·               Microwave Harris True Point installation, including test, provisioning and customer delivery

·               DAS Implementation (BDA ) in-building distribution antenna installation, to improve indoor coverage area

 

Comunicaciones Nextel de México S.A.Monterrey, Mexico

Field Operation Senior Manager11/2003 – 12/2007

 

·               Sizing and dimensioning the O&M northeast department to manage more than 500 cellular site as a project, dimensioning budgetary operation, human resources and hiring process for the project (CAPEX and OPEX), sizing regional market budget for seven local markets, (O&M influence area staff outsourcing, engineers and coordinators), facilities, vehicles, tools, spares and budget for daily operation (OPEX) with contractors

·               Scheduling maintenance process joins together with coordinator's for contractors, determining workflow and identify and reduce cost with average annual savings of 18%

·               Use of Oracle 11i and 10g to oversee financial statement, to analyze and reduce operation cost over USD $1 million of budgets assignment, capable of distributed and prioritized OPEX and CAPEX expenses

·               Developing service level agreements between areas and contractors, developing maintenance and installation technical process which hold a place into the ISO9000 certification

·               Designing and creating of original financial and daily operation work files reports, developed trough the expert use of MSOffice (specially MS Access, MS Excel and MS Project) or with the use of VB program and VBA code to create new and innovative database reports to support budget (OPEX and CAPEX) and complex statistics management for daily operation

·               Coordinated all project management to accept new site installation and SDH microwave backbone (Ericsson and Harris) from Ciudad Juarez and Chihuahua, Matamoros-Reynosa and Monterrey and the metropolitan rings of Torreon, Monterrey, and Chihuahua

·               Successful year after year microwave annual troubleshooting program, developed to audit microwave network by the analysis and certification of the line of sight, traffic routing, interferences and performance (path survey analysis) on site and with historical data, throughout Pathloss and MapInfo programs, increasing performance, re-homed recommendations and analysis. Optimizing old microwave traffic and performance

·               Daily RF traffic statistical analyzer and network performance observer, working together with RF staff members analyzing block and drop calls, link budget, antenna parameters, hardware provisioning, new site recommendation and frequency interference and utilization

·               Analyzed and implemented corrective action plans by the use of innovating Post Mortem report, improving personnel capability by creating effective corrective maintenance process to elicit faster repairs and reduce shutdown time

 

EBTS Manager09/2000 – 11/2003

 

·               Senior engineer promoted to manage all employee aspects, maintenance process, and budget control

·               Established preventive and corrective maintenance plans for employees and workflow for contractors, designed technical procedures and conducted post maintenance monitoring to ensure performance and net reliability according to RF parameters and statistics

·               Project lead for microwave net re-design, installed in Nuevo Laredo, emitting new path survey analysis via Pathloss and MapInfo, certifying on site and in paper, line of sight, interference analysis, and polarizations problems, detected and implemented corrective actions plans, increased network performance

·               Technical RF knowledge, installing the first combiner hardware configuration on site (in Mexico), this increased channel capacity (channel per sector)

·               Improved and applied specific maintenance programs for contractors, wit 12% annual average savings of OPEX budget

 

Field Installation Manager04/1998 – 08/2000

 

·               Project coordination skills, scheduling and tracking large-scale installations projects, implemented more than 480 cellular sites in the Center, Pacific and North of Mexico, on-time delivering and multitasking scheduling according to the Project Manager necessities

·               Constant hardware recommendation, saving more than $4 million USD in material contractors works labors and USD$700,000 in works labors from assigned CAPEX budget, trough re-engineering of CD power plant working together with the vendor, battery backup and HVAC cool capacity and distribution.

·               Identifying systems and equipment distribution determining and recommending equipment and ground system installation, type of RF lines trough loss of signal study due to distance and recommend better distribution on tower and hardware ancillary for microwaves antennas and RF panel antennas.

·               Mentoring engineers and contractor to achieve and reduce labor installation time from 28 days to 5 days (from layout to final ATP) saving more than 15% of the assigned budget.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TRAININGS

 

·               OSHA 10 hours certification

·               WCDMA/GSM Commissioning and Integration Level 2, NSN certification, Dallas Tx, USA

·               C-RRU Rooftop and Ground Level 1, NSN certification, Houston Tx, USA

·               Tellabs 8100 Alarm analysis, Tellabs, Mexico City, Mexico

·               O&M Microwave Digital Radio Megastar SDH, Harris, Mexico City, Mexico

·               EBTS Installation, Operations and Maintenance, Motorola, Mexico City, Mexico

·               Installation, Operations and Maintenance of Lorain Power System 123A2 spec: PLM 80000, Marconi, Mexico

·               RF and Microwave Fundaments, Agilent Technologies, Mexico City, Mexico

·               O&M Microwave Digital Radio Microstar 13-23 GHz, Harris, Mexico City, Mexico

·               Systems of Ground Connection in Electrical Networks, Actualizacion Profesional Especializada

·               Minilink E O&M, Ericsson Telecom S.A. de C.V., Mexico City, Mexico

·               Grounding Practice and Applications for AC and DC Electrical Distribution Systems, R.O. Associates, LTD.

·               Avantel Outside Plant Operations and Maintenance, MCI, Richardson, Texas

·               O&M Microwave Digital Radio Series M, LC, Spectrum and Classic II, DMC, Mexico City, Mexico

·               RBS Installation, Teleindustria Ericsson S.A. de C.V., Mexico City, Mexico

·               Extend-A-Cell, Allen Telecom Group, Mexico City, Mexico

·               MDR-4XXX Microwave Digital Radio Maintenance, Alcatel Network Systems, Richardson, Texas

·               DMX-3003N Digital Multiplex Maintenance, Alcatel Network Systems, Richardson, Texas

 

KNOWLEDGE OF LANGUAGES

 

Spanish   mother tongue

English    fluent

Victor Salinas HernandezPage 1

 



Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Work Status:

US - I require sponsorship to work in this country.

Active Security Clearance:

None

US Military Service:

Citizenship:

None

 

 

Target Company:

Company Size:

 

Target Locations:

Selected Locations:

US-CA-Orange County

Relocate:

Yes

Willingness to travel:

Up to 100%